Commit Graph

14 Commits

Author SHA1 Message Date
d570e3cfef Merged PR 19340: Test wafer quantity 2025-06-23 20:22:02 +02:00
17e320923f Merged PR 19265: Moved call to MonA Metric setting above the local service error setting as th...
Moved call to MonA Metric setting above the local service error setting as the call to that MonA service was clearing out errors and preventing them from making their way back to the GUI.
2025-06-21 01:33:55 +02:00
ebd8b36d13 smart scanner metrics 2025-06-10 08:57:13 -07:00
4037b2fa45 Merged PR 15668: Refactored Lot Event
Refactored Lot Event methods.
1. Moved all lot event methods to a new LOT_EVENT_SERVICES service module.
2. Simplified CreateLotEvent routine
3. Updated all calling stored procedures.
2025-04-28 21:02:24 +02:00
3ba7ffe782 Pushed a change for TW Tracking Phase 2 yesterday that broke current system. Added in gating logic 2025-02-12 16:47:18 -07:00
5e00026748 Various bug fixes with scanner, form validation within the adjust lot qty form, and added scroll bars on the view lot form 2025-02-11 15:25:57 -07:00
63bded8bb1 Finished developing TW Req'd on metrology frequency for OI UI loading 2025-01-10 13:59:31 -07:00
a8a88f83cc Fixed erro handling bug in Test_Run_Servics -> CreateTestRunRecord routine 2024-11-25 21:44:51 +01:00
3a2ff00722 Re-adding from old branch 2024-11-25 21:44:51 +01:00
a752fe61a0 Removed code not ready to commit. 2024-10-31 16:23:34 +01:00
508707f0f2 Added in functionality for TW WIP Reporting
Refactored error logging and catching.
2024-10-31 16:23:34 +01:00
7762b129af pre cutover push 2024-09-04 20:33:41 -07:00
6ea6969f4b getting repo caught up 2024-05-22 14:06:46 -07:00
c667dd56eb added LSL2 stored procedures 2024-03-25 14:46:21 -07:00