12 Commits

Author SHA1 Message Date
Ouellette Jonathan (CSC FI SPS MESLEO)
d5514bc3ca Merged PR 13180: Excluded ReactorType EPP from prompting for TW's
Excluded ReactorType EPP from prompting for TW's
2025-03-18 18:26:56 +01:00
Ouellette Jonathan (CSC FI SPS MESLEO)
49c9ab09fd Merged PR 10039: Code to determine if a test wafer usage logging is required.
Description
Created method to determine if a TW is required.

HTR and ASM type reactors will required a test wafer to be logged on runs where a test wafer is prescribed.
ASM+ type reactors will require a test wafer to be logged on one run prior to a run where a test wafer is prescribed for metrology.
This code is gated by an active switch which will be removed when the system goes live.

EpiPro is not effected

Related work items: #222043
2025-02-04 18:53:58 +01:00
Infineon\Ouellette
0da14ae4ae Updated Method to determine if test wafer is required. 2025-01-30 22:52:33 +01:00
Infineon\Ouellette
bdd3c84a78 Made changes to Load Signature to exlude epipro 2025-01-23 11:00:20 -07:00
Infineon\Ouellette
24261d918b Fixed some bug, reverse logic. 2025-01-13 13:34:02 -07:00
Infineon\Ouellette
63bded8bb1 Finished developing TW Req'd on metrology frequency for OI UI loading 2025-01-10 13:59:31 -07:00
Infineon\Ouellette
f143b3e60c Added switch to be able to turn on/off feature. 2024-11-25 21:44:51 +01:00
Infineon\Ouellette
3a2ff00722 Re-adding from old branch 2024-11-25 21:44:51 +01:00
Infineon\StieberD
24a246a99b added logic to RDS_ACTIONS to restore load signatures if erased unexpectedly
refactored solution to leverage the LOT and LOT_EVENT tables

minor fix
2024-11-05 17:51:13 -07:00
Infineon\StieberD
7762b129af pre cutover push 2024-09-04 20:33:41 -07:00
Infineon\StieberD
6ea6969f4b getting repo caught up 2024-05-22 14:06:46 -07:00
Infineon\StieberD
c667dd56eb added LSL2 stored procedures 2024-03-25 14:46:21 -07:00