68 lines
		
	
	
		
			2.4 KiB
		
	
	
	
		
			Markdown
		
	
	
	
	
	
			
		
		
	
	
			68 lines
		
	
	
		
			2.4 KiB
		
	
	
	
		
			Markdown
		
	
	
	
	
	
| ---
 | ||
| created: 2024-09-26T14:40:29.696Z
 | ||
| type: note
 | ||
| updated: 2024-09-26T14:40:43.731Z
 | ||
| ---
 | ||
| 
 | ||
| # 2024-09-26
 | ||
| 
 | ||
| Comments below in blue.
 | ||
| 
 | ||
| EPI Process equipment types:
 | ||
| Type	Count
 | ||
| 68020	
 | ||
| ASM	10
 | ||
| HTR	4
 | ||
| 68040	
 | ||
| ASM	2
 | ||
| ASM+	15
 | ||
| HTR	8
 | ||
| EPP	
 | ||
| EPP	8
 | ||
| RCM	
 | ||
| HTR	8
 | ||
| Grand Total	55
 | ||
| 
 | ||
| Mike Phares
 | ||
|  
 | ||
| Infineon Technologies Americas Corp.
 | ||
| Software Engineer, Factory Equipment Integration
 | ||
| Job ID: 29985
 | ||
| IFAM IT FI MES
 | ||
| Mobile: +1 602 550-9220
 | ||
| Mike.Phares@infineon.com
 | ||
|  
 | ||
| 
 | ||
| From: Ojha Abinash (CSC FI FE PCS FDC) <Abinash.Ojha@infineon.com> 
 | ||
| Sent: Monday, September 16, 2024 6:03 AM
 | ||
| To: Bischoff Christian (CSC FI FE PCS FDC) <Christian.Bischoff@infineon.com>
 | ||
| Cc: Phares Mike (IT FI MES) <Mike.Phares@infineon.com>; Zulkefli Zaril Ezzuddin (CSC FI FE PCS) <ZarilEzzuddin.Zulkefli@infineon.com>
 | ||
| Subject: RE: Mesa APC Data
 | ||
| 
 | ||
| Hello Christian,
 | ||
| 
 | ||
| Could you please align with Mike on below topics,
 | ||
| -	understand the status of FDC components versions in MESA
 | ||
| o	Master Control Service v1.0.2.1, PDX Service v1.0.2.1 and Receiver Service v1.0.3.1.
 | ||
| -	present & future of equipment connectivity to FDC in MESA (current number of connected equipments & plans)
 | ||
| o	GaN was close and was never used in production.
 | ||
| o	GaN fab shutdown in May of 2023.
 | ||
| o	GaN fab database has a few work-centers / equipment that need to be deleted to re-use database.
 | ||
| Looking for support to delete data. 
 | ||
| o	Si fab has one process and a few metrology operations to support the process.
 | ||
| o	For the one process there are 7 variations that Mesa is looking to add to fault detection.
 | ||
| o	Variation RCM-HTR is a PLC based communication and we have EAF and EDA configured but not verified.
 | ||
| o	Variations: 68020-ASM, 68020-HTR, 68040-ASM, 68040-ASM+ and 68040-HTR all use the same version of SECS/GEM messaging.
 | ||
| This SECS/GEM is currently installed on two equipment with more to be purchased.
 | ||
| Variation EPP-EPP has connectivity capabilities, but this will be evaluated last.
 | ||
| o	Metrology equipment is currently in InfinityQS SPC and have a multi-year plan to migrate to SPaCe SPC.
 | ||
| -	whether the FDC data access restriction still valid or MESA could be open for general access like other FE sites ?
 | ||
| o	MESA has both restricted parts and non-restricted, but all data is within restricted zone (EC Stealth).
 | ||
| -	Does it make sense to upgrade FDC to latest version
 | ||
| o	If support is available, I would push to remain close to Villach’s version.
 | ||
| 
 | ||
| Based on your alignment,  please come with a future proposal for FDC in MESA.
 | ||
| 
 | ||
| Best Regards
 | ||
| Abinash
 |