open-insight/LSL2
Ouellette Jonathan (CSC FI SPS MESLEO) ea156489f1 Merged PR 21245: Added in a check for the active flag when adding an operation to a lot. Added...
Added in a check for the active flag when adding an operation to a lot. Added in material handler group to the CanUserModifyLot check.

Given the addition of a check for the active flag to allow adding an operation. I checked all OPERATION records to ensure that flag has already been set. The only operations that had a value other than true were the OPERATION records related to Return To Fab Lot processing.

Tested and verified creating test wafer lots, and creating RTF forms.
2025-07-22 00:31:04 +02:00
..