Daniel Wathen
|
1633c82323
|
Fixed issue with previous week quarterly targets in daily report
|
2023-07-05 15:31:28 -07:00 |
|
Daniel Wathen
|
32182e8f7c
|
Added R52 and R54 together for Hot WO's running.
|
2023-06-21 10:09:08 -07:00 |
|
Daniel Wathen
|
72e7a55ab4
|
Updated daily report to show correct information when two work weeks split quarters.
Also current changes to project with Blazor implementation is implemented here as well.
|
2023-04-03 09:58:28 -07:00 |
|
Daniel Wathen
|
7ca02958dc
|
Changed reactor event query to only use REACT_EVENT table
|
2023-03-01 16:45:47 -07:00 |
|
Daniel Wathen
|
a67cc55abe
|
Removed console logging for hold date and added display of daily and weekly part changes (completed and projected).
|
2023-01-23 13:47:17 -07:00 |
|
Daniel Wathen
|
0de14ec886
|
When EPP tools have Hot WOs assigned, it also brings in the pairing tools (40 brings in 42, 44 brings in 46, 48 brings in 50)
|
2023-01-19 15:13:16 -07:00 |
|
Daniel Wathen
|
afdd487b7d
|
Moved all of the file paths to appsettings file.
|
2023-01-19 13:05:54 -07:00 |
|
Daniel Wathen
|
a963525b43
|
Added Hot Work Order information into downed tool table and as a line item in the daily report.
|
2023-01-18 16:03:42 -07:00 |
|
Daniel Wathen
|
7cde09d7b8
|
Fixed typo in Daily Report, added IDLE and ENGINEERING_DEVELOPMENT to IsInProduction list, and changed unscheduled reactors calculations.
|
2023-01-17 08:31:59 -07:00 |
|
Daniel Wathen
|
9525355b55
|
Added Hold Report to the production reports.
|
2023-01-16 12:28:48 -07:00 |
|
Daniel Wathen
|
62df6323d0
|
SLLTools.json file and DailyReportInfo.json file automatically clear the first time it runs on Monday, and fixed bug when scrap is resolved as null.
|
2023-01-16 00:55:07 -07:00 |
|
Daniel Wathen
|
a2512b41e1
|
Changed metric for determining wafers needed for quarter, included reactor log comments, made downed tools table larger, fixed bug in determining reactor capcity
|
2023-01-13 14:25:01 -07:00 |
|
Daniel Wathen
|
8d65b82af6
|
Ran formatting through code
|
2023-01-12 13:19:05 -07:00 |
|
Daniel Wathen
|
096043d6ca
|
Fixed HTR downed tools header, added quarter to date information, and put extended downtime into tool downed tables.
|
2023-01-12 10:50:10 -07:00 |
|
Daniel Wathen
|
6436465fa1
|
Removed all references to FabTime
|
2023-01-11 10:00:39 -07:00 |
|
Daniel Wathen
|
43e5ec3e28
|
Used queries to get data from scrape database instead of FabTime to use a single data source.
|
2023-01-11 09:46:03 -07:00 |
|
Daniel Wathen
|
569fd84725
|
Updated logging.
|
2023-01-06 11:52:50 -07:00 |
|
Daniel Wathen
|
6de41bc8da
|
Updated appsettings.json file to change base api url based on environment. Also fixed bug in calculation of yield percentage.
|
2023-01-05 15:10:40 -07:00 |
|
Daniel Wathen
|
9f08d6630c
|
Added calculation for daily planned wafer outs and display on production report.
|
2023-01-04 19:26:33 -07:00 |
|
Daniel Wathen
|
8bc7d7bdde
|
Changed several synchronous database calls to asynchronous calls.
|
2023-01-04 17:17:24 -07:00 |
|
Daniel Wathen
|
81f7e1a57b
|
Simplified Manual Report Entry
|
2023-01-04 16:34:31 -07:00 |
|
Daniel Wathen
|
83525d0149
|
Updated UnloadTemps repo to get data for whole week instead of just the last day.
|
2023-01-04 15:33:52 -07:00 |
|
Daniel Wathen
|
e3b4e68425
|
Cleaned up references to repositories in the UI that were overlooked
|
2023-01-04 14:32:13 -07:00 |
|
Daniel Wathen
|
1adb303d99
|
Added backend API project to segregate responsibilites - Data is now handled in API project and business is all handled in UI project.
|
2023-01-04 14:19:59 -07:00 |
|