@model Fab2ApprovalSystem.ViewModels.WorkRequestPdf @{ ViewBag.Title = "WorkRequestPDF"; }
Fab2 Lot Traveler Special Request - SWR# @Model.SWRNumber | Version | Rev @Model.Revision | |||||||||
Section 1:Work Request | |||||||||||
SWR# | @Model.SWRNumber | Title | @Model.Title | ||||||||
Originator | @Model.OriginatorName | Last Lot Type | @Model.LotType | PCRB# | @Model.PCRBNumber | ||||||
Submit Date | @Model.SubmitedDate | Affected Departments | @Model.AffectedDepartments | ||||||||
Status | @(Model.Status == 1 ? "Approved" : "Pending") | Affected Modules | @Model.AffectedModules | ||||||||
ITAR | @(Model.IsITAR ? "Yes" : "No") | Engineering Lot Start Required | @(Model.EngLotStartRequired == 1 ? "Yes": "No") | Lot Type Conversion | @(Model.LotTypeConversion == 1 ? "Yes": "No") | Qual Lot | @(Model.QualLot == 1 ? "Yes" : "No") | ||||
Purpose of Lot / Change Description | @Html.Raw(@Model.PurposeOfRequest) |
Section 1-A:Engineering Wafer Lot Start | ||||||||
WIP Lot# | @Model.LotNumber | Start Date | @Model.PlannedLotStartDate | Sch. Close Date | @Model.PlannedScheduledCloseDate | |||
Lot Start Charge Dept# | @Model.ChargeDepartment | Allocation to Use | @Model.AllocationToUse | Predicted Cycle Time | @Model.PredictedCyleTime | Days |
Starting Material | Total Qty: @Model.TotalQty | ||||
WIP PN# | Description | EPI Silicon Part# | Qty | Supplier | Source |
@material.WIPPartNumber | @Model.PartDescription | @material.EPISiliconPartNumber | @material.Quantity | @material.Supplier | @material.Source |
Lot Start Check List | ||||||
OnHand/Existing | Silicon: @(Model.SiliconOnHand ? "Yes" : "No") | Reticle Set: @(Model.ReticleOnHand ? "Yes" : "No") | SPN transfer: @(Model.SPNTransferOnHand ? "Yes" : "No") | |||
Probe Card: @(Model.ProbeCardOnHand ? "Yes" : "No") | Probe Recipe: @(Model.ProbeRecipeOnHand ? "Yes" : "No") | Process Change Details: @(Model.ProcessChangeDetailsOnHand ? "Yes" : "No") | ||||
Comments | @Model.LotStartCheckListComments |
Lot Start in SPN | |||||
SIGNON | SURP | WIP AREA | @Model.WIPArea | ||
VERB | START | Start Date | @Model.PlannedLotStartDate | ||
WIP Lot# | @Model.LotNumber | WIP PN# | @Model.WIPPartNumber | ||
Type | @Model.LotType | Process Flow | @Model.ProcessFlow | ||
Start Qty | @Model.StartQty | Qual Lot | @(Model.QualLot == 1 ? "Y" : "") | ||
VERB | COMMENT | @Model.VerbComment | |||
Record Silicon Lot #s in SPN and tape tags to Traveler | @(Model.RecordSiliconLotInSPNTapeTagTotrav == 1 ? "Yes" : "No") | ||||
Silicon Lot#s: Cassette 1 | @Model.SiliconLotNoCassette1 |
Section 2: OLHOLD and Engineering Deviation Specified by Originator | |||||
Base Flow | Locn | Operation | Description | Change Instuctions | File Names |
@holStep.BaseFlow | @holStep.Location | @holStep.Operation | @Html.Raw(@holStep.OperationDescription) | @Html.Raw(@holStep.ChangeInstructions) | @holStep.FileNames |